Testimonials
| "After playing the game myself, I saw this as a powerful tool to help change the way we think and act about our business." |
| Brian Johnson Reliability Team Leader Alyeska Pipeline Service Company |
| "The impression that people have when they go to the game is sort of an "ah ha" experience. It really doesn't teach anything that people who have a lot of experience in maintenance and operations don't already know. It gives them a way to see a bird's eye view of those things that they thought about but didn't really know how to put their finger on. It gives them an opportunity to say, "See, this is what I have been trying to say all this time." "There were a few areas where we felt we had not been successful, but when we went back almost two years later to check progress, we found that that they were launching defect elimination action teams and getting results. It really demonstrates to us the lasting change this workshop creates in people." |
| Steve Smith, Principal Industrial Engineer Eastman Chemical |
| "For a total investment of $5,000 an action team was able to eliminate $1.5 million per year in operating losses. This loss could have been eliminated years ago but for many reasons continued. It took a new way of thinking, based on The Manufacturing Game® Workshops, to release the creative energy to take action." "By removing defects and preventing input of new defects, we shifted some of our bad habits and 'at-risk' behaviors into safe habits. As a result safety improved." |
| Paul Monus British Petroleum |
| "An Action Team of operators, mechanics and engineers found the root cause of our centrifuge problems, saving $150,000 in maintenance costs and delivering $5 million in additional throughput." |
| GayEllen Stulp Eli Lily |
| The Manufacturing Game® created the proper atmosphere for accomplishing the work. Our Action Teams found and eliminated over 100 defects. The savings in our area exceeded $2 Million" |
| Micky Logan Eastman Chemical |
| "The game shows that the interconnection of the functions has a bearing on how we do our maintenance - we must all work together as a team, rather than doing our work separately. Seeing this has changed my whole approach." |
| Jerry Leach, Maintenance Planner |
| "The key thing that some of us woke up to was the idea of defects...the fact that they impact everything we do." |
| Tommy Fagan Weyerhaeuser |
| "The Manufacturing Game® played a major role in improving throughput by 21% without spending any significant capital." |
| Kirk Wolfinger Whirlpool |
| "A cross functional action team modified a bracket magazine, which was shutting down the line. Their efforts produced an annual savings of $45,000." |
| Jim Dray Whirlpool |
| "A cross functional Action Team pinpointed the root cause of a problem that was costing us at least $40,000 a year. What was amazing was that the team had a solution to this 4-month old problem within minutes." |
| Winston Lakshman PCS Trinidad |
| Small groups have been responsible for cost savings, reduction in downtime, improvements in direct pass rate and cycle-time reduction on equipment throughout the plant. One example is a 53% reduction in downtime and a 5% increase in run rate on a modular transfer machine." |
| John Lightcap Honda |
| "We found that the game and the action teams created the needed excitement and commitment that was missing in our earlier attempt at Total Productive Maintenance." |
| Jim Slaton Phillips Chemical |
| "It shows the interrelationships with all of the groups in a way people can understand. The people closest to the factory floor understand it best because it is the work they do every day." |
| Mike Innes Abitibi-Price, Inc. |
Achieve Your
Reliability Goals
Reliability Goals
| We've been helping companies around the world achieve their reliability goals since 1993. We can help you. Let's Discuss How > |
Testimonials
"After playing the game myself, I saw this as a powerful tool to help change the way we think and act about our business."
Brian Johnson,
Alyeska Pipeline Service Co.
Brian Johnson,
Alyeska Pipeline Service Co.
"An Action Team of operators, mechanics and engineers found the root cause of our centrifuge problems, saving $150,000... and delivering $5MM additional throughput."
GayEllen Stulp, Eli Lily
GayEllen Stulp, Eli Lily
"Our Action Teams found and eliminated over 100 defects. The savings in our area exceeded $2 Million"
Micky Logan,
Eastman Chemical
Micky Logan,
Eastman Chemical
"The game shows that the interconnection of the functions has a bearing on how we do our maintenance.... Seeing this has changed my whole approach."
Jerry Leach,
Maintenance Planner
Jerry Leach,
Maintenance Planner
"The key thing that some of us woke up to was the idea of defects...the fact that they impact everything we do."
Tommy Fagan,
Weyerhaeuser
Tommy Fagan,
Weyerhaeuser
"The Manufacturing Game® played a major role in improving throughput by 21% without spending any significant capital."
Kirk Wolfinger,
Whirlpool
Kirk Wolfinger,
Whirlpool
"A cross functional action team modified a bracket magazine, which was shutting down the line. Their efforts produced an annual savings of $45,000."
Winston Lakshman,
PCS Trinidad
Winston Lakshman,
PCS Trinidad
Upcoming Events
Asset Operations Excellence |
Featured Case Study
|
Butane Sphere BP Refinery—Lima, OH In just a few months, this team eliminated over $1.5 million annually in operational losses with only a $5,000 investment. Read More > |
Newsletter
| Sign up |



